
Plan valve access
Identify fill points, narrow areas, changes in height and surfaces that must remain clear of adhesive. Arrange the fixture and hose so the operator can guide the valve through those positions.
Keep the material supply controlled
The MFS4545 preparation unit provides separate A/B tanks and metered delivery. The operator handles the valve; the approximately 160 kg preparation unit stays in its planned floor position.
Inspect the result
Check fill coverage, deposited quantity and the cured assembly against the part requirements. Where air removal at the workpiece is part of the process, review a chamber-based vacuum potting system.

