
Measure the starting process
Record material consumption, accepted parts, purging, cleaning, rework, energy use and operator handling. These are separate inputs to a process comparison.
Identify what automation changes
Automatic preparation, metering and path control can change different parts of the workflow. A handheld valve retains operator-guided movement, while a gantry follows programmed paths.
Keep handling and safety in the review
Include material instructions, ventilation, guarding, cleaning and maintenance in the station plan. Equipment automation does not replace those process controls. Compare equivalent parts and inspection results before assigning a productivity or environmental improvement.

