
Arrange the operator’s work
Position the part so the dispensing valve can reach the required areas without awkward access. Include hose routing, fixture height, loading space and a controlled place to rest the valve.
Prepare for material handling
Plan container changes, cleaning, purging and waste collection alongside normal dispensing. Follow the adhesive safety data sheet and the equipment instructions for handling and protective measures.
Evaluate the whole station
The MFS4545 preparation unit is floor-standing; the dispensing valve is handheld. Review the manual application sequence, deposit target and inspection together when selecting the workstation.

