Contact sales
Ms. TangWhatsApp+86 180 5174 6202veady@szweidi.com

Mon–Fri, 9:00 AM–6:00 PM (UTC+8)

Material preparation and metering in a potting system

Understand the difference between tank degassing, A/B metering and workpiece encapsulation in the MFS4545 format.

Related Veady equipment: Dual-Component Material Preparation Unit

Preparing the A and B materials

Heating, stirring, circulation, level monitoring and degassing condition the two components before delivery. The preparation requirements follow each material’s chemistry and handling instructions.

Metering the deposit

MFS4545 lists ≤±3% proportioning and dispensing precision and 3–10 g/s dispensing speed. Ratio, total deposit and material condition are separate process controls.

Where vacuum is applied

The listed ≤2 mbar figure concerns material preparation. It should not be read as a chamber specification around the workpiece. Use the VPS range for chamber-based workpiece encapsulation.

Related equipment

Discuss your application with Veady.